Эти карточки ещё не сохранены — они исчезнут, как только ты уйдёшь. Заведи бесплатный аккаунт, чтобы сохранить их и получить доступ ко всем функциям ниже.
What is the primary purpose of the Namibian Electricity Safety Code (NESC)?
To ensure the safety of all persons (staff and customers).
Просматривай карточки здесь или sign up to study with spaced repetition.
Name two other purposes of the NESC besides personnel safety.
Просматривай карточки здесь или sign up to study with spaced repetition.
List two NESC Level 1 safety items a meter reader must know.
Просматривай карточки здесь или sign up to study with spaced repetition.
What should you do regarding entering a low-voltage kiosk?
Never climb inside a kiosk and remain outside when possible.
Просматривай карточки здесь или sign up to study with spaced repetition.
Who may perform repairs under the Low Voltage regulations?
Only qualified personnel may perform repairs.
Просматривай карточки здесь или sign up to study with spaced repetition.
Name two meter tampering indicators mentioned.
Просматривай карточки здесь или sign up to study with spaced repetition.
Give one revenue protection difference between prepaid and post-paid meters.
Prepaid reduces revenue loss for utilities.
Просматривай карточки здесь или sign up to study with spaced repetition.
What is one vulnerability of post-paid meters noted in the text?
Post-paid is vulnerable to meter bypass and late payment.
Просматривай карточки здесь или sign up to study with spaced repetition.
What must you confirm before disconnecting a customer?
Confirm authorization before disconnecting.
Просматривай карточки здесь или sign up to study with spaced repetition.
What must be done before reconnecting a supply?
Never reconnect without proof of payment and document the reconnection.
Просматривай карточки здесь или sign up to study with spaced repetition.
State the task prioritisation order given for field work.
1) Safety → 2) Revenue loss → 3) Customer service → 4) Admin
Просматривай карточки здесь или sign up to study with spaced repetition.
List three handheld unit (HHU) practices to follow before starting a route.
Просматривай карточки здесь или sign up to study with spaced repetition.
Name three common meter types used at Erongo RED.
Просматривай карточки здесь или sign up to study with spaced repetition.
What must photos, timestamps, and GPS coordinates ensure for documentation?
They ensure accurate documentation and tamper evidence.
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the policy on working alone in unsafe areas?
If the area is unsafe, do NOT proceed alone; call for support or backup.
Просматривай карточки здесь или sign up to study with spaced repetition.
What should a meter reader do if a customer refuses access?
Be prepared to follow revenue protection procedures and record the refusal appropriately.
Просматривай карточки здесь или sign up to study with spaced repetition.
How should a meter reader handle aggressive or difficult customers?
Remain calm, professional, prioritize safety, redirect to supervisor, and document the incident.
Просматривай карточки здесь или sign up to study with spaced repetition.
What must you never do regarding accepting favors related to tampered meters?
Do not accept money or favors to overlook a tampered meter; maintain integrity.
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the primary purpose of the Revenue Protection role?
Просматривай карточки здесь или sign up to study with spaced repetition.
Name three core responsibilities of a Revenue Protection Meter (RPM) officer.
Просматривай карточки здесь или sign up to study with spaced repetition.
What PPE must be worn before entering a kiosk according to NESC Level 1 guidance?
Просматривай карточки здесь или sign up to study with spaced repetition.
What safety checks must be performed before touching equipment?
Просматривай карточки здесь или sign up to study with spaced repetition.
What does the Low Voltage regulation (≤ 1000V) requirement include for RPM work?
Просматривай карточки здесь или sign up to study with spaced repetition.
What does the tampering detection mnemonic B-C-B-I-T stand for?
Просматривай карточки здесь или sign up to study with spaced repetition.
List the immediate actions to take when meter tampering is detected.
Просматривай карточки здесь или sign up to study with spaced repetition.
Give two key differences between prepaid and post-paid meters.
Просматривай карточки здесь или sign up to study with spaced repetition.
List three advantages of electronic meters compared to old disc meters.
Просматривай карточки здесь или sign up to study with spaced repetition.
What are the recommended steps when dealing with an aggressive or difficult customer?
Просматривай карточки здесь или sign up to study with spaced repetition.
What troubleshooting steps should you take when an HHU malfunctions or a reread is needed?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the correct prioritisation order of tasks for RPM officers (highest to lower)?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the correct priority order for tasks when on duty (highest to lowest)?
Просматривай карточки здесь или sign up to study with spaced repetition.
Name three integrity rules meter readers must follow.
Просматривай карточки здесь или sign up to study with spaced repetition.
What immediate steps should you take on finding an illegal connection during meter reading?
Просматривай карточки здесь или sign up to study with spaced repetition.
List common main dangers in a low-voltage kiosk.
Просматривай карточки здесь или sign up to study with spaced repetition.
How should you handle an aggressive customer who threatens you?
Просматривай карточки здесь или sign up to study with spaced repetition.
What checks indicate a suspect or faulty meter?
Просматривай карточки здесь или sign up to study with spaced repetition.
What actions should you take if you suspect a meter is faulty?
Просматривай карточки здесь или sign up to study with spaced repetition.
What steps should you take if the HHU malfunctions during meter reading?
Просматривай карточки здесь или sign up to study with spaced repetition.
Give three indicators of meter tampering to check for.
Просматривай карточки здесь или sign up to study with spaced repetition.
Name practical experiences that qualify a candidate for meter reading roles.
Просматривай карточки здесь или sign up to study with spaced repetition.
What safety standard is mentioned as followed during switching and isolation?
Просматривай карточки здесь или sign up to study with spaced repetition.
What are the first steps to start the day with the HHU?
Просматривай карточки здесь или sign up to study with spaced repetition.
What must you verify before recording a meter reading in the field?
Просматривай карточки здесь или sign up to study with spaced repetition.
What actions are required at end of day with the HHU?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the HHU summary of uses?
Просматривай карточки здесь или sign up to study with spaced repetition.
List three immediate actions when handling an aggressive customer after disconnection.
Просматривай карточки здесь или sign up to study with spaced repetition.
What safety and reporting steps should you take during an aggressive incident?
Просматривай карточки здесь или sign up to study with spaced repetition.
Name key precautions before entering a low-voltage kiosk.
Просматривай карточки здесь или sign up to study with spaced repetition.
What PPE and verification are required for entering a low-voltage kiosk?
Просматривай карточки здесь или sign up to study with spaced repetition.
How should you balance customer service with enforcing policy?
Просматривай карточки здесь или sign up to study with spaced repetition.
What recordkeeping supports transparency when enforcing policy?
Просматривай карточки здесь или sign up to study with spaced repetition.
What steps should you take to identify and report irregularities at kiosks or premises?
Просматривай карточки здесь или sign up to study with spaced repetition.
What follow-up actions are required after reporting a tamper or non-conformance?
Просматривай карточки здесь или sign up to study with spaced repetition.
How do you stay updated on electricity regulations and internal procedures?
Просматривай карточки здесь или sign up to study with spaced repetition.
What on-the-job actions help maintain procedural knowledge?
Просматривай карточки здесь или sign up to study with spaced repetition.
List the candidate's key achievements mentioned.
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the candidate's professional goal for the next five years?
Просматривай карточки здесь или sign up to study with spaced repetition.
What minimum qualification is listed for the Revenue Protection Assistant role?
Просматривай карточки здесь или sign up to study with spaced repetition.
Name one practical experience requirement for the role.
Просматривай карточки здесь или sign up to study with spaced repetition.
List two functions the candidate must understand for the role.
Просматривай карточки здесь или sign up to study with spaced repetition.
What are three responsibilities combined in the Revenue Protection Assistant role?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the first action when discovering an illegal bypass while meter reading?
Просматривай карточки здесь или sign up to study with spaced repetition.
After confirming meter tampering, what documentation steps are required?
Просматривай карточки здесь или sign up to study with spaced repetition.
What must you do immediately after documenting a tampering incident?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the correct immediate action when meter readings don't match during a reconnection?
Просматривай карточки здесь или sign up to study with spaced repetition.
If meter readings disagree, what verification steps should you take before reconnecting?
Просматривай карточки здесь или sign up to study with spaced repetition.
How should you respond if a customer offers payment to reconnect without authorization?
Просматривай карточки здесь или sign up to study with spaced repetition.
According to the NESC Level 1 answer, what is the first safety step before entering a kiosk?
Просматривай карточки здесь или sign up to study with spaced repetition.
What personal protection measure is listed for working on a meter inside a kiosk?
Просматривай карточки здесь или sign up to study with spaced repetition.
What career goal is mentioned for the next five years?
Просматривай карточки здесь или sign up to study with spaced repetition.
What commitment to the employer is stated in the notes?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the first action to take before entering an electrical kiosk under NESC Level 1?
Просматривай карточки здесь или sign up to study with spaced repetition.
What personal protective equipment (PPE) is required before working on energized or potentially energized equipment?
Просматривай карточки здесь или sign up to study with spaced repetition.
How should isolation be verified before touching electrical equipment?
Просматривай карточки здесь или sign up to study with spaced repetition.
When should Lockout/Tagout (LOTO) be applied?
Просматривай карточки здесь или sign up to study with spaced repetition.
What does the NESC guidance say about contacting exposed energized parts?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the definition of Low Voltage (LV) in the provided guidance?
Просматривай карточки здесь или sign up to study with spaced repetition.
Who may work on or near Low Voltage (LV) installations?
Просматривай карточки здесь или sign up to study with spaced repetition.
What are common indicators that a meter may have been tampered with?
Просматривай карточки здесь или sign up to study with spaced repetition.
What is the primary purpose of the Namibian Electricity Safety Code (NESC)?
To ensure the safety of all persons (staff and customers).
Name two other purposes of the NESC besides personnel safety.
List two NESC Level 1 safety items a meter reader must know.
What should you do regarding entering a low-voltage kiosk?
Never climb inside a kiosk and remain outside when possible.
Who may perform repairs under the Low Voltage regulations?
Only qualified personnel may perform repairs.
Name two meter tampering indicators mentioned.
Give one revenue protection difference between prepaid and post-paid meters.
Prepaid reduces revenue loss for utilities.
What is one vulnerability of post-paid meters noted in the text?
Post-paid is vulnerable to meter bypass and late payment.
What must you confirm before disconnecting a customer?
Confirm authorization before disconnecting.
What must be done before reconnecting a supply?
Never reconnect without proof of payment and document the reconnection.
State the task prioritisation order given for field work.
1) Safety → 2) Revenue loss → 3) Customer service → 4) Admin
List three handheld unit (HHU) practices to follow before starting a route.
Name three common meter types used at Erongo RED.
What must photos, timestamps, and GPS coordinates ensure for documentation?
They ensure accurate documentation and tamper evidence.
What is the policy on working alone in unsafe areas?
If the area is unsafe, do NOT proceed alone; call for support or backup.
What should a meter reader do if a customer refuses access?
Be prepared to follow revenue protection procedures and record the refusal appropriately.
How should a meter reader handle aggressive or difficult customers?
Remain calm, professional, prioritize safety, redirect to supervisor, and document the incident.
What must you never do regarding accepting favors related to tampered meters?
Do not accept money or favors to overlook a tampered meter; maintain integrity.
What is the primary purpose of the Revenue Protection role?
Name three core responsibilities of a Revenue Protection Meter (RPM) officer.
What PPE must be worn before entering a kiosk according to NESC Level 1 guidance?
What safety checks must be performed before touching equipment?
What does the Low Voltage regulation (≤ 1000V) requirement include for RPM work?
What does the tampering detection mnemonic B-C-B-I-T stand for?
List the immediate actions to take when meter tampering is detected.
Give two key differences between prepaid and post-paid meters.
List three advantages of electronic meters compared to old disc meters.
What are the recommended steps when dealing with an aggressive or difficult customer?
What troubleshooting steps should you take when an HHU malfunctions or a reread is needed?
What is the correct prioritisation order of tasks for RPM officers (highest to lower)?
What is the correct priority order for tasks when on duty (highest to lowest)?
Name three integrity rules meter readers must follow.
What immediate steps should you take on finding an illegal connection during meter reading?
List common main dangers in a low-voltage kiosk.
How should you handle an aggressive customer who threatens you?
What checks indicate a suspect or faulty meter?
What actions should you take if you suspect a meter is faulty?
What steps should you take if the HHU malfunctions during meter reading?
Give three indicators of meter tampering to check for.
Name practical experiences that qualify a candidate for meter reading roles.
What safety standard is mentioned as followed during switching and isolation?
What are the first steps to start the day with the HHU?
What must you verify before recording a meter reading in the field?
What actions are required at end of day with the HHU?
What is the HHU summary of uses?
List three immediate actions when handling an aggressive customer after disconnection.
What safety and reporting steps should you take during an aggressive incident?
Name key precautions before entering a low-voltage kiosk.
What PPE and verification are required for entering a low-voltage kiosk?
How should you balance customer service with enforcing policy?
What recordkeeping supports transparency when enforcing policy?
What steps should you take to identify and report irregularities at kiosks or premises?
What follow-up actions are required after reporting a tamper or non-conformance?
How do you stay updated on electricity regulations and internal procedures?
What on-the-job actions help maintain procedural knowledge?
List the candidate's key achievements mentioned.
What is the candidate's professional goal for the next five years?
What minimum qualification is listed for the Revenue Protection Assistant role?
Name one practical experience requirement for the role.
List two functions the candidate must understand for the role.
What are three responsibilities combined in the Revenue Protection Assistant role?
What is the first action when discovering an illegal bypass while meter reading?
After confirming meter tampering, what documentation steps are required?
What must you do immediately after documenting a tampering incident?
What is the correct immediate action when meter readings don't match during a reconnection?
If meter readings disagree, what verification steps should you take before reconnecting?
How should you respond if a customer offers payment to reconnect without authorization?
According to the NESC Level 1 answer, what is the first safety step before entering a kiosk?
What personal protection measure is listed for working on a meter inside a kiosk?
What career goal is mentioned for the next five years?
What commitment to the employer is stated in the notes?
What is the first action to take before entering an electrical kiosk under NESC Level 1?
What personal protective equipment (PPE) is required before working on energized or potentially energized equipment?
How should isolation be verified before touching electrical equipment?
When should Lockout/Tagout (LOTO) be applied?
What does the NESC guidance say about contacting exposed energized parts?
What is the definition of Low Voltage (LV) in the provided guidance?
Who may work on or near Low Voltage (LV) installations?
What are common indicators that a meter may have been tampered with?
Actions on suspected tamper: - Photograph clearly with timestamp and GPS if possible. - Issue tamper/non‑compliance notice per policy. - Report to supervisor / Revenue Protection Technician. - Disconnect only if authorised and safe to do so; document everything.
PLC meters (communication over power line).
Interviewers may ask: difference between a split meter and single‑unit meter — a split design separates measurement and user interface/control; a single unit contains all functions in one housing.
1) If you find an illegal connection: - Ensure personal safety, document (photos, GPS), report to supervisor, issue tamper notice, disconnect only if authorised.
2) Main dangers in a low‑voltage kiosk: - Exposed conductors, water ingress, poor earthing, loose wiring, insects/animals, confined space risks.
3) Aggressive customer who threatens you: - Stay calm, create distance, explain policy, refer to supervisor, document and report.
4) Suspect a meter is faulty: - Check display/seals/wiring, compare historical readings, photograph, report, do not attempt repairs.
5) HHU malfunctions during reading: - Troubleshoot, record manually, inform supervisor, upload later.
6) What to do if reconnection data mismatches system: - Pause reconnection, verify meter number/reading, record discrepancy, report to billing/supervisor, await authorization.
Вы уверены, что хотите удалить 0 карточку(и)? Это невозможно будет отменить.
Выберите теги для удаления из 0 выбранные карточки:
Загрузка тегов...